Project report on modernization of the lock and spillway at John Hollis Bankhead Dam, Black Warrior Reiver, Alabama

Project report on modernization of the lock and spillway at John Hollis Bankhead Dam, Black Warrior Reiver, Alabama

4.11 - 1251 ratings - Source



Inflow-outflow-pool stage relationships for standard project flood IV-3 Spillway stability analysis, summary and loading conditions IV- 4 ... ladder IV-26 Vertical lift gate hoisting machinery, general arrangement IV-27 Vertical lift gate hoisting machinery, design data and assembly-sections IV-28 Spillway gate hoist, typical wiring plan IV-29 Electrical gate hoist, schematic wiring diagrams IV-30 TABLE OFanbsp;...


Title:Project report on modernization of the lock and spillway at John Hollis Bankhead Dam, Black Warrior Reiver, Alabama
Author: United States. Army. Corps of Engineers
Publisher: - 1965
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA